Designed and installed in Rockhampton Consultations at your kitchen table, by appointment Free design & fixed quote — 0401 821 848
BILT & CO Rockhampton
7 min read

Replacing a kitchen
after the water goes down.

Rockhampton knows this drill. The cabinetry is rarely salvageable, the paperwork decides how much you get back, and the rebuild is your one chance to specify better.

The short answer

Photograph everything before you move or throw out anything — that is what the claim rests on, and it is free. Assume base cabinets that sat in water are gone, whatever anyone offers to dry out. Then use the rebuild to specify so the next one can be dried rather than replaced.

Stone benchtop and moisture resistant cabinetry detail
Delivered assembled, doors adjusted Specified and installed by us Fixed-price quotes, no variations Fully insured Central Queensland wide

Frequently asked

Common questions

If your question is not here, call the studio. We would rather talk it through than have you guess.

Ask us directly →
Will insurance cover a new kitchen after a flood?

That depends entirely on your policy, your excess and how the damage is assessed, and flood cover in particular is not included in every policy. Ask your insurer directly. What we can provide is the itemised scope and quote that a claim generally needs.

Can I choose my own kitchen supplier for an insurance job?

Often yes, though some policies steer you to a preferred repairer and some make that a condition. Ask your insurer before you commission anything. If you are free to choose, an itemised quote separating cabinetry, benchtop, hardware and installation is what assessors work from.

Can flooded kitchen cabinets be dried out and saved?

Rarely, if the carcasses are standard chipboard and sat in water. The board swells from the unsealed edges inward and the distortion often shows up weeks later, after the repair has been signed off. Moisture-resistant board does better. Be cautious of anyone promising to salvage submerged base cabinets.

What should I photograph before cleaning up?

Everything, before anything moves. The water line on the walls, every cabinet inside and out, under the sink, the floor, appliances and their serial numbers, both wide and close. Keep damaged doors until the assessor has attended. It costs nothing and it is the difference between an evidenced claim and an argued one.

Delivered assembled

The assembly is done
before it arrives.

Carcasses built square on a bench, Blum hardware fitted, doors hung and adjusted to even gaps. On site you are fixing finished cabinets to a wall, not building them on the floor. Our own team fits it in Central Queensland; your installer fits it anywhere else in Australia. Prefer to build it yourself? The same kitchen ships flat pack.

Oak kitchen with full-height marble splashback and stone island bench

American oak and stone

Timber-fronted island with stone top

Timber island, stone top

Black cabinetry bar with marble top

Black joinery, marble bar

What delivered assembled means, in detail →

Moisture resistant cabinetry and stone benchtop detail

After the water

One kitchen out.
One chance to specify better.

Moisture-resistant carcasses, laser-bonded edging and removable kickboards cost very little extra while you are rebuilding anyway, and change what happens next time. We work to whenever your floors and walls are signed off, not to our calendar.

Call 0401 821 848 Get my free quote